Iberia Parish · issues
Civic issues
Topics getting the most attention in Iberia Parish public meetings, ranked by how frequently they come up.
T Bayou drainage assessment public hearing April 29
A roughly $12 million diversion, detention and canal improvement plan is on the table, and the parish wants to raise its drainage standard from a 5-year to a 25-year storm to match neighboring parishes and stop new subdivisions from flooding neighbors.
Drainage easement reductions and watershed protection
The council drew a line in the sand on drainage: it denied giving 35 feet back on a canal easement, warning that ditches keep widening and giving away right-of-way now could cost the parish dearly later.
Drainage ordinance overhaul
The parish is rewriting its drainage impact rules for new development to match surrounding parishes' standards, using the latest rainfall data. A community flood survey is still open through early September as part of the drainage master plan.
Parishwide Drainage Master Plan
Engineers pitched Phase 1 of the parish's first-ever drainage master plan — about $240,000, likely paid with GoMESA money — to fix outdated ordinances, build flood models and position the parish for federal and state grant money.
Atchafalaya Basin management plan support
The Basinkeeper wants parishes to unite behind a plan to restore basin hydrology, stop sedimentation, and pipe sediment to the coast — it's about flood protection for south Louisiana communities before the 2029 master plan.